top of page
Search

Bathroom is done

keneddyr

The boys finished up yesterday. They had to install the glass door and complete the air vent installation. I was pleased with the quality of their work. I was a bit dismayed about the dust. They generated a lot of dust. They also covered the floors and stairs with drop cloths. I never saw them shake them out so everyday I’d dry mop the floors and then damp mop the floors. They should consider a huge heppa filter like the floor guys used when they were installing the hardwood flooring in the kitchen. The one thing I didn’t like was the toilet seat. The toilet wasn’t your Home Depot special. It was a one piece and quite pricey. The seat is cheap. Eventually, as we added electricity as part of the project we’ll add a bidet seat.



0 views0 comments

Recent Posts

See All

French Vacs

Switched to an online class out of Richmond. Huge mistake. In the classroom the teacher could see the pained looks on our face and use...

Advocate update - 12/19/2024

401k is in the toilet. It was doing great. Had a Covid booster on 12/18. In the past there seemed to be a relationship between afib...

Ad Hoc Check In - 11/27/2024

date dayOFdiet weight running weight loss daily weight loss MorningWIN exerciseWIN foodcals exercals 11/18/24 1 239.00 0.00 -0.30 239.00...

Comments


Post: Blog2_Post

Subscribe Form

Thanks for submitting!

  • Facebook
  • Twitter
  • LinkedIn

©2020 by Buppa Says. Proudly created with Wix.com

bottom of page